According to the monitoring and forecast by the meteorological and hydrological department, the current round of heavy rainfall has ended, and the water situation of rivers in the province is stable. According to the Emergency Plan for Flood, Drought, Wind, and Freezing Prevention in Guangdong Province and relevant regulations of the Provincial Flood Control Headquarters, the Guangdong Provincial Flood, Drought, and Wind Control Headquarters has decided to end the flood control level IV emergency response at 9:00 am on June 6th. Due to the continuous heavy rainfall in the early stage, the bottom water of rivers in our province is high, and the soil moisture content is saturated. The Provincial Defense Bureau requires all regions and departments to overcome complacency and laxity, continue to strengthen geological disaster prevention and traffic safety prevention, and strengthen monitoring and inspection of reservoirs and embankments. We need to strengthen the management of the resettlement of transferred personnel, strictly prohibit unauthorized returns until the risks are resolved, and resolutely ensure that there is no safety or return. We need to accelerate the repair of damaged facilities, restore normal production and living order as soon as possible, and make every effort to ensure the safety of people's lives and property. (Lai Xin She)
Edit:Lubaikang Responsible editor:Chenze
Source:southcn.com
Special statement: if the pictures and texts reproduced or quoted on this site infringe your legitimate rights and interests, please contact this site, and this site will correct and delete them in time. For copyright issues and website cooperation, please contact through outlook new era email:lwxsd@liaowanghn.com