On June 27, passengers were ready to enter the newly opened waiting hall. Recently, the passenger waiting hall of terminal 3 of Beijing Metro capital airport line was officially opened. Terminal 3 of the capital airport line is an above ground station, which is cold in winter and hot in summer, and the passenger waiting experience is poor. The newly built waiting hall covers a total area of 276 square meters and is equipped with air conditioners. In the future, passengers can no longer be troubled by the heat and cold wind when they are in the subway station. (Xinhua News Agency)
Edit:Li Jialang Responsible editor:Mu Mu
Source:chinanews.com
Special statement: if the pictures and texts reproduced or quoted on this site infringe your legitimate rights and interests, please contact this site, and this site will correct and delete them in time. For copyright issues and website cooperation, please contact through outlook new era email:lwxsd@liaowanghn.com