Zhang Guoqing Guiding and Supporting Flood Relief in Heilongjiang

2023-08-07

Recently, the flood situation in Heilongjiang and other areas has been severe, with some areas suffering from severe flooding disasters. Zhang Guoqing stressed that we should send more professional rescue forces to continue to carry out search and rescue in accordance with the mountain terrain characteristics of the lost and trapped people. In response to the significant uncertainty of subsequent rainfall, it is important to trust its presence and magnitude, and not relax and take preventive measures. At present, many reservoirs are operating beyond the flood limit, and it is necessary to reduce the water level in an orderly manner to prevent risks and hidden dangers caused by continuous high water level operation, and to make room for storage capacity in response to subsequent rainfall. With the convergence of tributary floods, the flood control pressure on Songhua River, Nenjiang River and other main streams is increasing. We should be prepared and guard against death. We should preset emergency supplies and equipment to the front line in advance, strengthen the reinforcement of dangerous sections, deal with major dangers such as piping and dam break in a timely manner, and firmly hold the bottom line of safe flood season. We must resolutely and decisively evacuate and transfer the threatened population, ensuring a clean and efficient evacuation. We need to carefully and meticulously relocate the affected population, ensure the supply of basic living materials, and meet reasonable needs such as seeking medical treatment. Relevant departments should coordinate the allocation of disaster relief materials, allocate disaster relief funds in advance, provide professional guidance in meteorological and hydrological monitoring, and integrate emergency rescue forces of state-owned and central enterprises into local unified dispatch and command. They should actively help the affected areas solve practical difficulties, quickly repair damaged infrastructure such as communication, transportation, water and electricity, carry out post disaster recovery and reconstruction as soon as possible, and restore normal production and life order as soon as possible. (New News Agency)

Edit:He Chuanning    Responsible editor:Su Suiyue

Source:Xinhua

Special statement: if the pictures and texts reproduced or quoted on this site infringe your legitimate rights and interests, please contact this site, and this site will correct and delete them in time. For copyright issues and website cooperation, please contact through outlook new era email:lwxsd@liaowanghn.com

Return to list

Recommended Reading Change it

Links

Submission mailbox:lwxsd@liaowanghn.com Tel:020-817896455

粤ICP备19140089号 Copyright © 2019 by www.lwxsd.com.all rights reserved

>