Photo Gallery

The largest and heaviest cylindrical FPSO built in China set sail for the North Sea in Europe

2022-12-07   

On December 6, the largest and heaviest cylindrical FPSO (floating production, storage and unloading unit) built in China set sail from Qingdao, Shandong Province. It will take about 55 days to reach the North Sea in Europe, with a total voyage of more than 17000 nautical miles. It is reported that the cylindrical FPSO launched this time, named "Penguin", was built by China National Offshore Oil Engineering Co., Ltd. for Shell Oil Company. Its overall height is 118 meters, which is equivalent to a 42 storey residential building, and its total weight is about 32000 tons. It is the largest and heaviest cylindrical FPSO built in China, and it is also the highest level of automation control and the most complete intelligent data delivery in China so far The cylindrical "offshore oil and gas processing plant" with the most advanced design concept. (UAV photo) The picture shows the "Penguin" FPSO being loaded on board on December 2. (Photo of UAV) On December 2, workers untwisted the "Penguin" FPSO to be shipped. (Liu Xinshe)

Edit:Ying Ying Responsible editor:Wang Chen

Source:www.chinanews.com.cn

Special statement: if the pictures and texts reproduced or quoted on this site infringe your legitimate rights and interests, please contact this site, and this site will correct and delete them in time. For copyright issues and website cooperation, please contact through outlook new era email:lwxsd@liaowanghn.com

Recommended Reading Change it

Links